Industrial policy and supply chains
2026-04-26
12 min read
10 sources
Copper and the Electrification Supercycle: Why 2026 Breaks the Bear Case
Codelco below 1.4 million tonnes, Cobre Panama still cold, AI grid copper at 3 to 4 kg per kW, and Chinese smelter TC/RC at zero. The supply side is losing its argument.
The copper market enters 2026 with a supply book structurally short of the demand it has signed up to serve. Codelco is guiding sub 1.4 million tonnes of mined output, the lowest since 1998, while Freeport's Grasberg is past peak grade, BHP's Escondida is grinding through head grade decay, and Glencore's Collahuasi expansion remains stall...